Central Valley Fire Department’s new maintenance facility was built to support the fire trucks, ambulances, and emergency vehicles serving Belgrade and the surrounding district. This project was especially meaningful to our team because it is just minutes from our shop, and many of the Blanton employees who helped build it live within the district those vehicles protect. Our neighbors supported the mill levy that made the facility possible, and the crews and equipment maintained there respond to calls on the same streets where we live, work, and raise our families.

Blanton Contracting served as the commercial general contractor for the 13,360-square-foot facility in Belgrade, Montana. The project combined a concrete-and-structural-steel maintenance shop with a wood-framed office component.

Every major system within the building was designed around a specific operational need. Specialized features include: 

  • Heated concrete floors
  • Humidity-controlled HVAC
  • Carbon dioxide monitoring
  • A custom vehicle exhaust extraction system
  • Dedicated maintenance and service areas
  • Wood-framed administrative offices
  • Durable metal roofing and siding

The completed facility now provides the Central Valley Fire Department with the infrastructure needed to maintain essential emergency vehicles serving communities throughout the Gallatin Valley and Southwest Montana.

Central Valley Fire Department Maintenance Facility

Case Study

Square Footage:
13,360 square feet

Location:
Belgrade, Montana

Timeline
7 months

Project Scope
Emergency Services Infrastructure

Industry
Commercial Construction

Blanton Contracting completed the Central Valley Fire Department maintenance facility on time and within budget despite an accelerated seven-month construction schedule and challenging winter conditions.

The facility is now operational and actively supporting the inspection, maintenance and repair of emergency response vehicles.

Delivering Critical Emergency Services Infrastructure for a Growing Community

the result

By consolidating specialized maintenance activities in a purpose-built facility, the department can more effectively support its fleet's readiness and reliability. The building provides technicians with the space, ventilation, monitoring systems and year-round environmental controls necessary to perform demanding vehicle maintenance safely and efficiently.

The project required coordination among Central Valley Fire Department leadership, the architect, the owner’s representative, state inspectors, Blanton’s internal project team and numerous specialty trade partners.

Blanton Contracting was selected for the project based on 65% design plans and a Guaranteed Maximum Price (GMP). From there, our team worked closely with the owner, design partners and permitting officials to maintain momentum and move the project into construction as quickly as possible. Within just two months, we completed the remaining design work, finalized the construction contract, secured the necessary permits, coordinated early procurement and broke ground. This accelerated preconstruction process minimized the risk of additional delays and allowed critical work to begin before inclement weather could affect the schedule. 

Through consistent communication and disciplined project management, the team maintained progress, resolved issues efficiently and delivered a facility that met the department’s operational, financial and scheduling requirements.

Central Valley Fire Department needed a dedicated facility designed specifically for servicing fire apparatus, ambulances and other emergency response vehicles.

Unlike a standard automotive or commercial shop, every component of the building needed to support a specialized use case. The facility had to accommodate large vehicles, demanding maintenance work and the safety requirements associated with exhaust, carbon dioxide, humidity and year-round indoor operations.

The project also needed to include functional office space for personnel overseeing fleet maintenance and facility operations.

Blanton Contracting coordinated the concrete and steel shop structure with the wood-framed administrative component to create one integrated commercial facility.

Because the project was supported by mill levy funding, responsible budget oversight and accountability were central to project delivery. The department needed a commercial general contractor capable of maintaining transparent costs, coordinating multiple stakeholders and completing the building within a compressed timeframe.

Construct a Purpose-Built Emergency Vehicle Maintenance Shop

The Goal

Cold temperatures and changing weather conditions required careful planning for:

  • Concrete placement
  • Structural steel installation
  • Building enclosure
  • Mechanical system installation
  • Exterior roofing and siding
  • State and local inspections
  • Interior office construction

Blanton developed and maintained a detailed construction schedule that allowed trade partners to remain productive while protecting the quality of the work.

Sequencing was particularly important. Exterior construction needed to advance quickly enough to enclose the building and allow interior mechanical, electrical and finish work to proceed without avoidable weather delays.

The specialized building systems added another layer of coordination. The heated slab, humidity-controlled HVAC system, carbon dioxide monitors and custom vehicle exhaust extraction system all had to operate together within a shop designed for oversized emergency vehicles.

Blanton worked closely with the mechanical contractors, equipment specialists, design team and department representatives to confirm that each system aligned with the facility’s intended use.

Managing Multiple Public-Sector Stakeholders
Municipal construction projects frequently involve multiple layers of oversight, documentation and inspection.

For the Central Valley Fire Department facility, Blanton coordinated communication among:

  • Department leadership
  • The architect
  • The owner’s representative
  • State inspection agencies
  • Blanton’s project management team
  • Specialty contractors and trade partners

The client brought previous commercial construction experience to the project and remained actively involved throughout the build. This hands-on participation supported efficient decision-making and helped the team address questions without slowing progress.

Regular communication, clearly assigned responsibilities and an organized project timeline kept stakeholders aligned from preconstruction through final turnover.




The Central Valley Fire Department project carried an aggressive seven-month construction schedule that extended through winter in Southwest Montana.

Maintaining Momentum Through a Fast-Paced Montana Winter

the challEnge

  • Year-round functionality: Incorporated heated concrete floors and a durable metal building envelope for dependable operation in every season.
  • Public-sector coordination: Managed communication among department leadership, design professionals, the owner’s representative and state inspectors.
  • Experienced client collaboration: Worked closely with a knowledgeable and engaged client team capable of making timely, informed decisions.
  • Trade partner coordination: Sequenced specialty contractors as a unified team so each trade could work efficiently without disrupting the overall schedule.
  • Regional impact: Delivered an essential facility that supports emergency vehicle readiness throughout the Gallatin Valley and Southwest Montana.
  • Accelerated delivery: Completed the 13,360-square-foot facility within a demanding seven-month schedule.
  • On-budget construction: Delivered the mill levy-funded project within its established financial parameters. 
  • Winter construction planning: Sequenced concrete, structural, exterior and interior work to maintain momentum through Montana winter conditions.
  • Purpose-built design: Constructed a commercial facility tailored specifically to emergency vehicle maintenance and repair.
  • Specialized ventilation: Integrated a custom vehicle exhaust extraction system appropriate for fire trucks, ambulances and other large vehicles. 
  • Environmental monitoring: Installed humidity controls and carbon dioxide monitoring to support a safer, more functional work environment.

PROJECT HIGHLIGHTS

What made this Belgrade commercial construction project successful:

The Central Valley Fire Department maintenance facility demonstrates the importance of detailed scheduling, experienced trade coordination and transparent communication on specialized public-sector construction projects.

As a commercial general contractor serving Belgrade, Bozeman and Southwest Montana, Blanton Contracting understands how to manage compressed schedules, specialized building systems, public funding requirements and multiple project stakeholders.

Our team brings hands-on leadership and organized project execution to municipal facilities, fleet maintenance buildings, commercial shops and other purpose-built construction projects.

Ready to Discuss a Commercial or Municipal Construction Project?

Work with a Gallatin Valley general contractor that prioritizes accountability, schedule management and clear communication from preconstruction through final turnover.

Contact Blanton Contracting to discuss your next commercial construction project in Bozeman, Belgrade or Southwest Montana.

A Commercial General Contractor for Complex Municipal Projects

“This space reflects our deep commitment to creating environments where Indigenous knowledge, identity, and community are honored and uplifted,” said Meredith Hecker, head of MSU’s Department of Native American Studies. “The outdoor classroom carries cultural significance in both its design and purpose, and each element is a thoughtful expression of respect for the land and cycles that guide traditional knowledge. It is a space for learning, gathering, and deepening our students' connection to land, culture, and community.”

 — Meredith H.

HEAR WHAT OUR CLIENTS say

Contact Blanton Contracting →

Ready to discuss your commercial construction project?

  
GET STARTED TODAY • GET STARTED TODAY